Move plans
A move plan turns your captured layout into a sequence of practical physical changes. Stowplan shows why it made each suggestion so you can reject advice that does not match the room in front of you.
Check readiness
Open Plan after the relevant spaces are mostly counted. The readiness panel separates information required to make a useful plan from details that would only improve confidence.
It may ask you to:
- finish an uncounted or in-progress space
- replace quick-capture defaults with a more useful item detail
- describe whether a destination is suitable
- add measurements when physical fit is uncertain
Each prompt opens the relevant Capture, Inventory, or Spaces editor. Measurements remain optional when capacity is not the question.
Generate and review
Generate a plan to move directly to a focused Next move card. Its source, destination, amount, and Mark moved action stay visible. Expand Why this move and review details when you need the reasoning or links to the underlying records, and expand Review full plan when you want the complete route.
Stowplan considers:
- rules that make a destination unsuitable
- measured capacity when both sides have compatible measurements
- items that should stay together
- easier access for frequently used things
- physical distance
- whether moving one nested container avoids many item-by-item moves
Missing measurements are shown as unverified capacity, not as proof that an item fits or does not fit.
Work through the steps
Complete plan steps in order because an earlier move may free space needed by the next one. After Mark moved, the same focused card advances to the next physical action.
Before completing a step, check the named source, destination, and amount against the physical item or container. If the saved workspace has changed since the plan was made, Stowplan stops and asks for review instead of moving a different record.
Use the item, container, and destination links inside the details disclosure to inspect the evidence without completing the step.
Change your mind
Plans are suggestions, not instructions you must obey. Make a manual move, adjust the priorities, discard the plan, or generate a fresh one after substantial edits.
Completed plan steps are ordinary workspace changes. Review or undo them from Activity when the physical result differs from the plan.